Monthly Archives: April 2012

Trench Drain Construction Sequence

Clockwise from top left. 1) The concrete bags pile up and disappear. 2) The rebar bender jumps in the picture. 3) Ready to pour. 4) Water flowing downhill.

Posted in Atelier Vie | Leave a comment

Boiler Close-up

Posted in Atelier Vie | Leave a comment